Photos Phase 2

Mobilization | Phase 1 | Phase 2

Installing rigging to relocate the enclosure for Phase 2 excavation

Testing the rigging prior to enclosure relocation

Moving part of the enclosure from Area 1 to Area 2

Positioning the enclosure in Area 2

Loading out excavated soil

Loading out excavated soil

Stockpiling clean fill for backfilling excavated sections.

Removing pipe from Phase 1 freeze wall

Excavating and applying odor suppressant foam