Mobilization | Phase 1 | Phase 2
Installing rigging to relocate the enclosure for Phase 2 excavation
Testing the rigging prior to enclosure relocation
Moving part of the enclosure from Area 1 to Area 2
Positioning the enclosure in Area 2
Loading out excavated soil
Loading out excavated soil
Stockpiling clean fill for backfilling excavated sections.
Removing pipe from Phase 1 freeze wall
Excavating and applying odor suppressant foam