WHAT’S NEW

EMERGENCY DRILL (11/22): The remediation contractor will conduct an emergency evacuation drill on Friday, November 22nd at around 11:45 am. There will be three air horn blasts and the crew will assemble in the mustering area near the entrance to the site.

FREEZE WALL TEST (WEEK OF 11/22): The remediation contractor will test the freeze wall for the next phase of remediation. To perform this task, approximately 5 limited areas outside of the enclosure and within the project perimeter will be temporarily excavated. Each hole will be backfilled following completion of the test. 

PROJECT ENTRANCE CAUTION: For the safety of employees and the community, the sidewalk and walking path adjacent to Route 29 (Market Street) and at the PSE&G project entrance has been closed. Please use an alternate route.