Mobilization
Equipment being brought to the site
Equipment being brought to the site
Set up office trailers
Set up security station
Begin installation of temporary chain link fence
Installation of temporary chain link fence
Installation of fence screening
Pulling back asphalt for pre-trenching
Asphalt loadout
Perimeter trenching
Construction of walkway
One of 5 air monitoring stations in place
Installation of electrical conduit outside of the remediation area
Paving of temporary walkway east of the helipad
Vibration meter
Crack gauge installation
Air sampling
Piping for freeze wall
Drill rig for freeze wall installation
Lighting installation for temporary walkway east of the helipad
Piping installation for freeze wall
Water truck utilized for mitigating dust
Evening work installing water treatment system discharge line outside of the project area
Evening work installing water treatment system discharge line outside of the project area
Cleaning parking lot area after evening work
Electrical equipment for freeze wall
Setting up frac tank for water management during remediation phase
Delivery of truck wash station
Chiller for freeze wall received
Pipes for freeze wall installed
Vessels for water treatment system
Vapor Management System ductwork for the enclosure
Section of tent frame brought to site
Frac tanks for water treatment system set in secondary containment
Completed water treatment system
Headers connected to freeze wall pipes
Concrete removal
Constructing arches for enclosure
Chiller connected to freeze wall
Freeze wall temperature gage for remote reading
Erecting the enclosure
Erecting the enclosure
Digging trench for chiller unit conduit
Brine delivery for freeze wall
Guard rail installation along freeze wall
Electrical conduit installation for freeze wall
Delivery of equipment for air filtration system
Completing the enclosure
Enclosure interior
Truck wash
Tent over water treatment system
Truck wash station inside enclosure
Excavation
The start of excavation
Applying odor suppressant foam
Excavation under the enclosure
Applying odor suppressant foam
Clean fill staging
Covering clean fill for the weekend
Enclosing water treatment system
Excavation progress of the first phase under the enclosure
Dewatering
Excavating against freeze wall
Backfill and compaction within first phase
Backfill and compaction within first phase
Applying odor suppressant foam within first phase
Street sweeper preparing to sweep the site
Installing freeze wall piping for the next phases
Excavation to bedrock within first phase
Backfill compaction testing within first phase
Tracking pad to remove clean fill
Applying odor suppressant foam
Backfilling within first phase
Plastic in place to distinguish phase 1 remediation from phase 2
Wrapped water treatment system piping for the winter